Copy URL of this page to share Send us an email comment Download this document (PDF, jpg, etc)

1979 FOR Petition to State Water Resources Control Board re Decision 1422 and saving the Stanislaus River (PDF)

Status: Live River
By: Friends of the River - Phil Williams Associates
Date: September 1, 1979
Description:

This 22 page (plus appendices) important FOR submittal to the California Water Resources Control Board followed an earlier report that analyzed why Decision 1422 could best be met by a reservoir behind New Melones Dam that extended no further than Parrott’s Ferry (except in rare floods) and most of the time would be far smaller, still meeting water and fishery needs defined by the Decision. The document was prepared by Phil Williams & Associates. Download the document by clicking on the green icon above.

Keywords: FOR, New Melones Dam, State
Format: Document
Collection: Admin's Collection
Rights: FOR 1979

Date uploaded: Apr 9, 2025
Date last modified: Apr 9, 2025