1979 FOR report showing how to operate New Melones Dam and save the Stanislaus River (PDF)
Status:
Live River
By:
Phil Williams & Associates
Date:
June 6, 1979
Description:
This important 10 page Friends of the River report by Phil Williams and D.W. Kelley lays out how California’s Decision 1422 could be used to define operating procedures for New Melones Dam that would spare the main rafting section of the Stanislaus River above Parrott’s Ferry – and far better meet the goals of the State’s Decision 1422, which set out the water allocations allowed for New Melones Dam. This document was also the basis for a subsequent longer submittal to the State’s Water Resources Control Board. Download the document by clicking on the green download icon above.
Format:
Document
Collection:
Admin's Collection
Rights:
FOR 1979
Date uploaded: Apr 9, 2025
Date last modified: Apr 9, 2025